Leadership
What Got You Here Won't Get You There
You don't build a house in two days by swinging the hammers faster. You build it in two days because of everything that was designed and prepared before the first hammer swung.
Picture a home renovation show.
In Season 1, the crew remodels a kitchen in a week. Nice. In Season 2, they remodel an entire home in a week. Impressive. In Season 3, they demolish an entire home and rebuild it from the ground up in two days.
Now ask yourself a simple question. How did they get from Season 1 to Season 3?
It wasn’t by asking the Season 1 crew to swing their hammers faster.
The Season 1 approach can’t give you Season 3 results.
The Two Days Are the End of the Project
Think about what would have to be true to rebuild a house in two days.
The house would have to be fully designed before demolition began. Not sketched. Designed. Every wall, every opening, every run of plumbing and wire. The permits would have to be in hand. The materials would have to be ordered, delivered, and staged in the order they’ll be needed. Some of the house would have to be built somewhere else, ahead of time, so it could be set in place. Every trade would need to know exactly when they’re on, what they’re doing, and who they’re handing off to. Inspections would have to be planned into the sequence, not discovered at the end of it.
In other words, the two days aren’t the project. The two days are the end of the project.
The reason the build is fast is that almost nothing is being decided during it. All of the deciding happened earlier. The build is just execution.
The Season 1 crew could get away with figuring things out on the job. A week of slack can absorb some amount of improvisation. Season 3 has no slack at all. Every unanswered question becomes a crew standing around waiting. With dozens of crews on site, waiting is catastrophic.
If you want to execute fast, you need more design and preparation, not less.
Woodsheds, Houses, and Skyscrapers
Not everything needs that level of preparation. If you’re building a temporary woodshed, you can just go for it. Improvise away. It’s easy to iterate and try again. Though you should probably stop to ask if maybe a more permanent woodshed would make sense.
A house is different. A house needs plans, permits, codes, and a sequence. For example, you can’t improvise the foundation after the framing is up. A skyscraper is different still. Nobody improvises a skyscraper. It requires engineering before construction, and the cost of getting the design wrong is measured in more than just large sums of money.
Here’s the problem. Most of the software that matters, the systems that run businesses, move money, keep people safe, and have to be maintained for years, are less like woodsheds and more like houses and skyscrapers. Yet many teams are approaching them like woodsheds.
And AI is making that temptation much worse.
Faster Hammers
AI has given every crew a set of power tools that would have been unimaginable a few years ago. Code that used to take days or weeks can be generated in minutes.
If you hand a crew faster hammers and no plans, you don’t get a two-day house. You may get the wrong house built very quickly, or you may get something that doesn’t even resemble a house at all! AI is an ambiguity accelerator and amplifier. Every unresolved question about structure, boundaries, and sequence now shows up immediately, and at scale.
I hear a version of this all the time: “We don’t need to do design. We can just generate it and see.” We spent the last twenty years being told to avoid “big design up front,” and many teams heard “avoid design altogether.” Why design when you can just generate?
Because generating isn’t building. Building a house requires knowing what house you’re building. The tool can’t decide that for you. It can only execute faster on whatever you’ve decided, or failed to decide.
What Preparation Looks Like in Software
So what is the software equivalent of everything that happens before the two-day build?
- The design. The system’s major components, their boundaries, and how they interact, decided before the crews show up. I’ve long argued for design before technology, and one of the constraints I keep coming back to is design big, build small (credit to Monty Montgomery for this phrase). You design the whole house so you can build it one well-defined piece at a time.
- The building codes. The constraints that must be adhered to. Naming, interfaces, data contracts, what a service may and may not do, how you are going to test and validate it, etc. Standards and plans don’t slow builders down. They let many builders work in parallel without the house falling apart.
- The staging. Infrastructure, pipelines, test harnesses, and guardrails in place before construction starts, so every crew is working on a prepared site instead of preparing it themselves.
- The sequence. Which pieces depend on which, what’s on the critical path, and who hands off to whom. This is project design, and it is just as much a design discipline as system design.
- The crews. Clear roles and responsibilities, so that on build day everyone knows exactly what they own.
When I was asked to start a new team with a heavy AI mandate, I spent the early months as a team of one. I wasn’t racing to ship features. I was preparing the site. Building out the infrastructure and the guardrails, establishing deterministic tests and tools we could trust, and getting the design and constraints in place. Once the engineers arrived, they were already building on a solid foundation.
Questions Worth Asking
If your organization wants Season 3 results, you should be asking questions like these:
- Is what we are building more like a woodshed, a house, or a skyscraper? Are we preparing accordingly?
- Is the design done before the crews arrive, or are we erroneously expecting it to emerge while we’re building?
- What are our building codes and standards and how will they be enforced?
- Is the site prepared? Are infrastructure, pipelines, and guardrails in place before construction begins?
- Do we know the sequence and the critical path, or are we hoping everyone works in parallel and it magically comes together at the end?
- Where might engineers end up “standing around waiting” for decisions to be made?
Closing
What got you here won’t get you there.
The Season 1 approach was good enough when the work was slower and the slack was generous. Teams could figure things out along the way, because the way was long and the stakes were not as high.
AI has accelerated the way. The build can now be fast. That means the design and preparation that come before the build matter more than they ever have.
So don’t ask your crew to swing their hammers faster. Design the house, prepare the site, and then build at speed and scale.